Saturday, June 2: Possible Power Outage at CCBO

Dear Cooper Team:

Please be advised that on Saturday, June 2, 2018, PSEG will be working on the L3 operations building and will be turning off the electricity from 6 a.m. to 4 p.m. to replace switches that power L3 buildings.

During this time, the CCBO building may also lose power on an intermittent basis. As a precaution, L3 is recommending that all computers and equipment be shut down before employees leave on Friday, June 1.

Power will be restored to the L3 campus before employees return to work on Monday.

Thank you for your cooperation.